Step 1: Site Preparation
Clear and level the installation area. Remove debris, rocks, and vegetation. The ground should be compacted and relatively level to within 2 inches over the entire building footprint.
Step 2: Frame Assembly — Base Section
Lay out all frame components according to the assembly diagram. Connect the base arch tubes with the vertical spacer tubes. Tighten all bolts and hardware to specification.
Step 3: Frame Assembly — Complete Structure
Connect all sections of the frame using the bolt-together system. Install crossbeams and lateral bracing. Ensure the frame is square and level before proceeding.
Step 4: Anchor Installation
Position ground anchors at each designated location. Drive the 1000mm ground stakes into the earth at the correct angle. Ensure anchors are secure and evenly distributed.
Step 5: Cover Installation
Unfold the PVC cover and position it over the frame. Start at one end and work toward the opposite end, securing the cover with ratchet tensioners.
Step 6: Tensioning the Cover
Use the heavy-duty ratchet tensioners to apply even pressure across the cover. The cover should be tight but not over-tensioned. Check for wrinkles and adjust as needed.
Step 7: Final Inspection
Check all anchor points, bolts, and hardware. Verify that the cover is evenly tensioned. Test the door systems and ensure all access points are secure.
Ready to Get Started?
Get a custom quote for your perfect fabric building size and configuration today.
Get a Quote →Ready to put a number on it?
Start with the published kit price and installation base for your building. Eligible new factory orders save 3% on the building before tax. Send your size and town for a quote that separates the building, installation and site extras.
Browse Buildings & Pricing Get Your Price Talk to a Building AdvisorSee the work around the building.
Site access, packaged components and equipment all need space. These examples show installation in progress, before the roof cover is in place.