Back to Blog

Step-by-Step: Assembling Your Fabric Storage Building

One of the biggest advantages of a fabric storage building is that most owners can assemble it themselves. Unlike conventional buildings that require specialized trades — concrete finishers, framers, electricians, and roofers — a fabric building goes up with basic tools and a small crew. Here is what to expect from start to finish.

Before You Start

Read the entire assembly manual before you unpack anything. Every fabric building kit includes detailed instructions specific to that model and size, and familiarizing yourself with the sequence of steps prevents costly mistakes. Lay out the hardware and inventory all components against the packing list. It is far easier to resolve a missing bolt before assembly begins than to discover it when you are 20 feet in the air.

Tools You Will Need

Most fabric building assemblies require surprisingly few tools: a socket set, adjustable wrenches, a cordless drill with socket adapter, a level, measuring tape, and a step ladder. Larger buildings benefit from having a telehandler or skid steer with forks for lifting trusses into position, though many crews manage with manual lifting for smaller sizes. Safety equipment — hard hats, gloves, and safety glasses — should be worn throughout the process.

Step 1: Base Rail Layout

Start by laying out the base rails along both sides of the prepared building pad. Use a measuring tape and string line to ensure the rails are parallel and square. Checking diagonal measurements from corner to corner confirms squareness — when both diagonals are equal, your layout is true. Anchor the base rails to the ground using your chosen method before proceeding.

Step 2: Truss Assembly and Erection

Assemble each galvanized steel double-truss frame on the ground next to the building site. The double-truss configuration — two parallel tubes connected by crossbeams — is assembled by bolting the crossbeams between the parallel tubes according to the manual’s torque specifications. Once assembled, each truss is lifted into position on the base rails and temporarily braced.

Start with the end trusses and work toward the middle, spacing them according to the manual. Having at least four people for truss raising makes the process safer and more efficient — two to lift and two to guide and brace.

Step 3: Purlins and Bracing

Once all trusses are standing, install the horizontal purlins that connect the trusses along the length of the building. These purlins serve two purposes: they provide the surface that the PVC cover will rest on, and they add lateral bracing that ties all the trusses together into a unified frame. Follow the spacing pattern specified in the manual precisely — cover fit depends on purlin placement.

Step 4: Cover Installation

Cover installation is best done on a calm day. Wind is the enemy of cover installation — even a moderate breeze can turn a large PVC cover into a sail that is difficult to control. Drape the 750 g/m² PVC cover over the frame starting from one end and pulling it toward the other. Most covers have a ratchet tensioning system that allows you to pull the cover tight once it is in position.

Proper tensioning is critical. A loose cover will flap in the wind, creating noise, accelerating wear, and adding dynamic loads to the frame. Take the time to tension the cover evenly across all attachment points.

Step 5: End Walls and Finishing

End walls are the final major component. Depending on your configuration, end walls may be full panels, partial panels with drive-through openings, or fully open. Install end wall framing according to the manual, then attach the end wall covers.

Timeline Expectations

Assembly time varies with building size and crew experience. A crew of four to six people can typically assemble a mid-size building (30 to 40 feet wide) in one to two days. Larger buildings in the 50- to 70-foot range may take two to three days. These timelines assume the site is already prepared and all tools are on hand.

Every building kit includes complete hardware, anchoring components, and step-by-step assembly instructions. For owners who prefer professional installation, many dealers can arrange experienced assembly crews at an additional cost.

Related Resources

Frequently Asked Questions

Can I assemble a fabric building myself?

Yes, MAX Storage Buildings are designed for DIY assembly with basic tools. Smaller models (20'×40' to 30'×60') can be assembled by 2–4 people in 1–2 days. Larger models may require a small crew and 2–4 days. All buildings come with detailed assembly instructions. If you'd prefer professional installation, we can connect you with experienced installers in your area.

What tools do I need to assemble a fabric building?

Basic assembly requires a socket set, wrenches, a ladder, and a rubber mallet. For larger buildings, a telehandler or forklift helps raise the assembled trusses. No welding, cutting, or specialized equipment is needed — all connections are bolt-together. Having a calm day for cover installation is important, as wind makes handling the large PVC cover significantly more difficult.

How long does it take to assemble a fabric building?

Assembly time depends on building size and crew experience. A 20'×40' building typically takes 4–8 hours with 2–3 people. A 50'×100' building takes 2–3 days with a crew of 4–6. The first assembly always takes longer than subsequent ones. Weather plays a role too — choose calm, dry days for the cover installation phase.

Ready to Protect Your Investment?

Explore our range of heavy-duty fabric storage buildings — 18 sizes from 20' to 70' wide.

Browse Buildings Get Approved for Financing Get a Quote
Call Now Get Approved